Incidenty

The guerrillas worsened the logistics of the Armed Forces of the Russian Federation, undermining the railway in the Crimea - the CNS (video)

According to the underground, the total load on and so extremely loaded railway network of the temporarily occupied south will increase. The Armed Forces of the Russian Federation will be more difficult to ship the cargo. The guerrillas blew railway tracks near Theodosius, damaging the Russian logistics system in the Crimea. This was stated in the center of national resistance. The report states that the Russian military logistics model was built on the railway.

Because of this, she is very vulnerable. "This is what the guerrillas were used again, which blew up the paths on the peninsula and thus terminated one of the railway connections," the CNS noted. It is also reported that due to diversion, the total load and a extremely loaded system of the temporarily occupied south will increase. The lack of supply of Russian occupation troops will increase.

It should be reminded that on June 21 it became known that unknown guerrillas blew up a railway in Feodosia. According to representatives of the occupying administration, due to damage to the cloth had to cancel the morning trains and suspend the trains. The causes of the injury are silenced. In addition, the UK said the occupiers are constructing defensive boundaries from the Armed Forces in the Crimea.